Construction of the Chmielnik northern beltway along DW765 from the intersection with DK73
The project included the construction of a 2.7 km northern beltway, including intersections, drainage system, storm water drainage, lighting at intersections, traffic safety and environmental protection devices and engineering facilities. a great convenience is the built viaduct over poviat road No. 0355t in Suchowola, in the commune of Chmielnik.
As part of the investment:
- expansion of national road DK73 with a length of about 1.3 km.
- construction of access roads with a total length of about 6.3 km along with sidewalks and bus bays
- pedestrian and bicycle paths
Access to the beltway will only be possible through the beltway intersections with:
- by national road DK73
- poviat without a number (Kielecka Str.)
- access to the Suchowola mine
- poviat road no. 0022t (Lubańska Str.)
- Szydłowska Str. and existing voivodship road DW765
Access roads have been designed in the area of intersections with public roads. the beltway will cross without a collision with poviat road No. 0355t (Pierzchnicka Street)
The investment was also associated with the reconstruction of the network:
- electrical
- water supply
- gas
- ICT
- construction of a passage for small animals and amphibians.
Your project description
To add a photo, description, specify a location or attach other materials about the project, you should fill out the form below. After clicking the “send” button, a message will be sent to you e-mail asking for confirmation. You must accept to submit the form. The EU Dot Map Guidelines and consent to the processing of personal data. materials will be sent to the editor of the site, who will publish it on the website after verification test.